How Many Bags of Concrete Are in a Cubic Yard?
Bags per cubic yard for 40, 50, 60 and 80 lb premix, when bags beat ready-mix, and how to plan a bagged pour.
Updated October 7, 2026
The short answer
A cubic yard of concrete takes 45 bags of 80 lb premix, 60 bags of 60 lb, 72 bags of 50 lb or 90 bags of 40 lb. Those counts come straight from the bag yields: a cubic yard is 27 cu ft, and an 80 lb bag makes about 0.60 cu ft.
Those are exact counts for exactly one yard. Add 5–10% for waste and uneven ground, and remember that a full yard of bagged concrete weighs around 3,600 lb before you add water.
How much each bag makes
Standard premixed concrete yields about 0.0075 cu ft per pound of dry mix. High-strength and fast-setting mixes often yield a little less, so check the bag.
| Bag size | Yield | Bags per cu yd |
|---|---|---|
| 40 lb | 0.30 cu ft | 27 ÷ 0.30 = 90 |
| 50 lb | 0.375 cu ft | 27 ÷ 0.375 = 72 |
| 60 lb | 0.45 cu ft | 27 ÷ 0.45 = 60 |
| 80 lb | 0.60 cu ft | 27 ÷ 0.60 = 45 |
Metric bags
Outside the US, premix is commonly sold in 20, 25 and 30 kg bags. Applying the same 0.0075 cu ft per lb gives these approximations. Yields vary more between brands here, so treat them as planning figures and use the yield printed on the bag.
| Bag size | Approx. yield | Bags per m³ |
|---|---|---|
| 20 kg | ≈ 0.0094 m³ (0.33 cu ft) | ≈ 107 |
| 25 kg | ≈ 0.0117 m³ (0.41 cu ft) | ≈ 86 |
| 30 kg | ≈ 0.0140 m³ (0.50 cu ft) | ≈ 72 |
The method
Volume (cu ft) = length × width × thickness (all in feet) Cubic yards = cu ft ÷ 27 Bags = cu ft × (1 + waste) ÷ bag yield, rounded up
Convert the thickness from inches to feet by dividing by 12 before you multiply. If you need a refresher on the volume step, see cubic yards explained.
Worked example: a 10 × 10 slab
A 10 × 10 ft patio slab, 4 in thick, with 10% extra.
- Thickness: 4 ÷ 12 = 0.333 ft
- Volume: 10 × 10 × 0.333 = 33.3 cu ft
- Cubic yards: 33.3 ÷ 27 = 1.23 cu yd
- With 10% waste: 33.3 × 1.1 = 36.7 cu ft (1.36 cu yd)
| Bag size | Calculation | Buy | Dry weight |
|---|---|---|---|
| 80 lb | 36.7 ÷ 0.60 = 61.1 | 62 bags | 4,960 lb |
| 60 lb | 36.7 ÷ 0.45 = 81.5 | 82 bags | 4,920 lb |
| 40 lb | 36.7 ÷ 0.30 = 122.2 | 123 bags | 4,920 lb |
Either way you’re moving nearly 2½ tons of dry mix. The alternative is 1.5 cu yd of ready-mix, since plants sell in quarter-yard steps and 1.36 rounds up to 1.5.
Worked example: post holes
Four fence posts set in 10 in diameter holes, 3 ft deep.
- Radius: 10 ÷ 2 = 5 in = 0.417 ft
- One hole: 3.1416 × 0.417² × 3 = 1.636 cu ft
- Four holes: 4 × 1.636 = 6.54 cu ft
- With 10% extra: 6.54 × 1.1 = 7.20 cu ft
- 80 lb bags: 7.20 ÷ 0.60 = 12 bags
The post itself takes up some of each hole, so 12 bags leaves a little margin. Jobs this size are where bags make sense: no truck, and you can mix one hole at a time. For footings and piers, the Footing Calculator handles the shapes.
Bags or ready-mix?
Bags suit posts, small pads, steps and repairs. Somewhere around 1 to 1.5 cubic yards, ready-mix usually becomes the better choice: it’s more consistent, arrives all at once, and saves a day of mixing.
- Short-load fees. Ready-mix plants usually add a fee to small orders, often anything under about 4 to 6 yards. That fee can make a small truck order cost more per yard than bags. Ask your local plant what their minimum is and what the fee would be.
- Access. The truck needs to get close to the forms, or you need a pump, or wheelbarrows and helpers.
- Cold joints. If you mix bags too slowly on a slab, the first batches start to set before the last go in, leaving a weak joint. Larger pours need either a mixer and a crew, or a truck.
The Concrete Cost Calculator compares bags against ready-mix with your local prices, so you can see where the crossover falls for your job.
Mixing logistics and weight
- Weight. 45 bags of 80 lb is 3,600 lb. Check your vehicle’s payload before loading; most stores will deliver a pallet.
- Mixer. For more than a dozen or so bags, rent a drum mixer. Hand-mixing in a wheelbarrow works for small jobs but is slow and tiring.
- Water. Use the amount on the bag and keep it consistent between batches. Extra water makes concrete easier to place but weaker once cured.
- People. One person mixing and one placing and finishing is the minimum for a slab. Line up help before you start.
Common mistakes
- Multiplying by thickness in inches. 10 × 10 × 4 = 400, which is not cubic feet. Divide inches by 12 first.
- Confusing cement and concrete. Premix bags are concrete. If you’re mixing from bulk cement, sand and gravel, use the Cement Calculator.
- No waste allowance: uneven subgrade can add a surprising amount of concrete.
For driveways, structural slabs, foundations and retaining walls, get local guidance or a contractor: strength, reinforcement and base matter as much as volume.
In metric
The figures above are in US units, as the manufacturers and standards give them. Here they are in metric, converted with the same factors the calculators use. Switch any calculator to m · cm to work in metric from the start.
| Figure in this guide | US | Metric |
|---|---|---|
| One cubic yard (27 cu ft) | 1 cubic yard | ≈ 0.765 m³ |
| 80 lb bag | 80 pounds | ≈ 36.3 kg |
| 60 lb bag | 60 pounds | ≈ 27.2 kg |
| 50 lb bag | 50 pounds | ≈ 22.7 kg |
| 40 lb bag | 40 pounds | ≈ 18.1 kg |
| Yield of an 80 lb bag | 0.6 cubic feet | ≈ 17 L |
| A yard of bagged mix, dry | 3,600 pounds | ≈ 1,633 kg |
Calculate it for your project
Enter your dimensions and bag size in the Concrete Bag Calculator. For slabs, columns, walls and steps with ready-mix quantities, use the Concrete Calculator.